During the period from 2006 to 2016 Stalker LLC successfully conducted exploration drilling and mining at 25 deposits throughout the territory of Kyrgyzstan. The total volume of drilling operations made more than 60 thousand linear metres of drill holes.

Main work sites:

  • Dolpran, Kurandzhailjau, Kamator, Kensuu – total drilling volume 11300 linear m, construction of technological roads and drilling pads – about 30 linear km, restoration and sampling of underground mining workings – 3800 linear m, open pit mining at the Kurandzhailjau  deposit. Customer – CJSC TK Geo Resource (Russia)
  • Kutesai II, Kalesaj, Aktjuz Ore Field – total drilling volume 6100 linear m, construction of technological roads and drilling pads – about 10 linear km, restoration and sampling of underground mining workings – 500 linear m. Customer – Stans Energy Group JSC (Canada)
  • Duvatash-Uchjar (Batken region), East Alysh, Austan – total drilling volume 11000 linear m, construction of technological roads and drilling pads – about 20 linear km. Customer – Jany Jyldyz Gold LLC (Russia)
  • Tujuk-Kargasha, Minteke – total drilling volume 7900 linear m, construction (restoration) of technological roads and drilling pads – 50 linear km. Customer – CJSC Bajdamar (Australian shareholders)
  • Taldybulak Levoberezhnyi  – total underground drilling volume (operational exploration) 2500 linear m. Customer – Altynken LLC (China)
  • Dzhel-Aryk – total drilling volume 1000 linear m. Customer –  ZET Cement LLC (Kyrgyzstan)
  • Dzhel-Aryk 2 – total drilling volume 950 linear m, construction of technological roads and drilling pads – about 8 linear km. Customer – Terek-Tash LLC (Kyrgyzstan)
  • Gezart (Osh region) – total drilling volume 2000 linear m. Customer – Monteks LLC (Kyrgyzstan)
  • “Molodjozhnoe” site – total drilling volume 1000 linear m. Customer – Accept Group LLC (South Korea)
  • Ashuutor (Issyk-Kul region) – total drilling volume 900 linear m, construction of technological roads and drilling pads – 15 linear km. Customer – United Asia Enterprises LLC (Australia)
  • Chakyrkorum – total drilling volume 500 linear m, construction of technological roads – 12 linear km. Customer – Golden Pass LLC (Kyrgyzstan)
  • Kok-Moinok, “Bezwodnyi” site (Issyk-Kul region) – total drilling volume 1000 linear m. Customer – JSC EurAsia in Kyrgyzstan
  • Ak Tjuz Gold Mill – laying the first branch of the tailings slurry pipeline, 10.5 linear km. Customer – CJSC TK Geo Reserve (Russia)
  • Turasuu (Issyk-Kul region) – total drilling volume 850 linear m, construction of technological roads and drilling pads – 12 linear km. Customer – Alpha Mining LLC (Kyrgyzstan)

Operations map